|
|
|
No cutting up the original hull and using it, a complete new correct size frame was fabricated to scale. | |
|
|
Fabricated front drive sproket | |
|
|
Original photo | |
|
|
Driver and MG gunner position. | |
|
|
|
|
Fitment of the engine. 6 cylinder Detorit. You can get any part locally. | |
|
|
|
|
Some manpower help from the Gruppe to get the tracks on. | |
|
|
|
|
|
|
|
Brake vents. | |
|
|
Engine was fitted to the rear of the tank. | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Engine vents ready to go! | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Head lights and turn signals, its in the details. | |
|
|
|
|
|
|
|
|
|
Turrent hand crank. | |
|
|
Mulit piece barrel, correctly tapered. | |
|
|
Fitted with the new mantel. | |
|
|
|
|
|
|
|
|
|
|
|
Page II |
|